Cutover and ground straps
Add the option to cutover a 3 bushing pot from series to parallel leaving 1 x bushing “dead.” Allow us to add or remove ground straps on the x2 bushing of a 3 bushing series pot. 277/480 pots should be able to produce straight 480 even with a 3 bushing pot if ground straps are removed properly. Not all real work scenarios will have exactly the transformer you want to make it easiest.

An Anonymous User 8 days ago
Cutover and ground straps
Add the option to cutover a 3 bushing pot from series to parallel leaving 1 x bushing “dead.” Allow us to add or remove ground straps on the x2 bushing of a 3 bushing series pot. 277/480 pots should be able to produce straight 480 even with a 3 bushing pot if ground straps are removed properly. Not all real work scenarios will have exactly the transformer you want to make it easiest.

An Anonymous User 8 days ago
In Progress
Will not open
downloaded to my iPad and it will open and stay on the black screen. Tried to delete and re download and still nothing

An Anonymous User about 1 month ago
High Priority
In Progress
Will not open
downloaded to my iPad and it will open and stay on the black screen. Tried to delete and re download and still nothing

An Anonymous User about 1 month ago
High Priority
Planned
Random hookup generator
Allow users to randomly generate scenarios, either provide the transformers already configured or let users configure them themselves, and then set a “customer wants” voltage then the user has to figure out how to provide this voltage accordingly.

An Anonymous User about 2 months ago
Planned
Random hookup generator
Allow users to randomly generate scenarios, either provide the transformers already configured or let users configure them themselves, and then set a “customer wants” voltage then the user has to figure out how to provide this voltage accordingly.

An Anonymous User about 2 months ago
Completed
change secondary voltages in results view to show lowercase a, b, c, n voltages and color code them to match the canvas

James Kennedy about 2 months ago
Completed
change secondary voltages in results view to show lowercase a, b, c, n voltages and color code them to match the canvas

James Kennedy about 2 months ago
Planned
Add way to share hookups
Allow users to share hookups, if receiver doesn’t have the app still allow them to view via web link or screenshot.

James Kennedy about 2 months ago
Planned
Add way to share hookups
Allow users to share hookups, if receiver doesn’t have the app still allow them to view via web link or screenshot.

James Kennedy about 2 months ago
move add transformer button onto the canvas to allow for room for a new canvas state button, clears everything and could even popup a view for configuring source and transformers so users dont have to individually add and configure each transformer

James Kennedy about 2 months ago
move add transformer button onto the canvas to allow for room for a new canvas state button, clears everything and could even popup a view for configuring source and transformers so users dont have to individually add and configure each transformer

James Kennedy about 2 months ago
Completed
color code the results labels to match their corresponding terminal colors
maybe even just show voltages on the canvas itself

James Kennedy about 2 months ago
Completed
color code the results labels to match their corresponding terminal colors
maybe even just show voltages on the canvas itself

James Kennedy about 2 months ago
calculate voltages and amps especially with available load on each transformer in three phase banks is invaluable
Messages from tester: it’s called PowerKVA, it was tailored more toward a 4.8 and 34.5kv system, but the data it calculates pertaining to voltages and amps especially with available load on each transformer in three phase banks is invaluable 7:35 AM We always need to make sure we’re accommodating minimum load, both on the “power” transformer that’s providing strictly 3 phase, and the lighter” that’s sharing the lights and 3 phase load.

James Kennedy about 2 months ago
calculate voltages and amps especially with available load on each transformer in three phase banks is invaluable
Messages from tester: it’s called PowerKVA, it was tailored more toward a 4.8 and 34.5kv system, but the data it calculates pertaining to voltages and amps especially with available load on each transformer in three phase banks is invaluable 7:35 AM We always need to make sure we’re accommodating minimum load, both on the “power” transformer that’s providing strictly 3 phase, and the lighter” that’s sharing the lights and 3 phase load.

James Kennedy about 2 months ago